WISER ASSET

PROJECT 03 / HUNAN · YIYANG ANHUA

Anhua gold tailings
Investment proposal

From tailings resources to gold assets.
Regarding this round's resources, independent production line and funding arrangements,
Establish a reviewable project investment path.

Preliminary proposal · Testing, trial production and dedicated terms await confirmation

RESOURCE → PROCESS → GOLD02 / ASSET
TAILINGS RESOURCEGOLD ASSETResources proposed to be securedRefining · Testing · Sales
Project pathway illustration / Not proof of physical assets or capacity
10010,000 wet tonnes

Resources proposed to be secured in this round

4,000RMB 10,000

Proposed financing this round · RMB

1,500dry tonnes / day

Independent new-line design capacity

Approximately 3months

Construction plan after funding is in place

01 / INVESTMENT SCOPE

The starting point of investment,
Defines clear resource boundaries.

Located in Anhua, Yiyang, Hunan, this project organizes purchasing, collection, transport, processing and gold sales around the gold tailings proposed to be secured in this round. Resource delivery, collection and transport deadlines, and project interests are confirmed in mine-specific documents.

Review the Anhua project's research evidence ↗
HUNAN / Hunan

Anhua, Yiyang

Mine-source county → Proposed processing destination in Chenzhou, Hunan

County-level source and processing destination illustration; specific mine locations, transfer points and routes remain to be finalized.
Resource scope for this round
Proposed procurement commitment: 1 million wet tonnes
Ore supplier entity materials
Guizhou Huiyuan Trading Co., Ltd.
Shown according to information provided by the sponsor; contracts and authorizations await review.
Ore-securing payment budget
RMB 5 million, included in the RMB 40 million total
Delivery and deadlines
The proposal envisages an exclusive securing period of 3 months
Formal extraction/transport and processing arrangements must cover the full project cycle.

Wet and dry tonnes are measured separately. The previous proposal lists a delivery target of 700,000 dry tonnes, requiring confirmation against contracts and measured moisture.

02 / EXECUTION PATH

Independent production line,
Connect the process through to gold sales collections.

A separate new line is planned for the Anhua project. Design throughput, commissioning results and stable measured capacity will be disclosed separately by stage.

01 / RESOURCE

Commitment and extraction/transport

Ore-source contracts and resource scope
Extraction/transport coordination and batch-by-batch weighing

02 / CONSTRUCTION

Construction and commissioning

Production line and supporting construction
Mine-specific testing and process validation

03 / PRODUCTION

Processing and gold output

Plant intake, feeding and operating records
Gold output weighing and metal plate testing

04 / CASH FLOW

Sales and accounting

Sales settlement and bank collections
Cost allocation and return accounting

Approximately 3-month construction plan

Proceed after funding is in place and startup conditions are met, including construction, supporting facilities and commissioning. Operating timelines and distribution milestones depend on actual commissioning and dedicated agreements.

Key mine-specific verification priorities

Representative sampling and wet/dry basis → Process suitability and recovery rate → Stable processing capacity → Actual gold output and sales collections

03 / CAPITAL ALLOCATION

RMB 40 million,
How project launch is supported.

Funding arrangements cover ore commitments, production-line construction, operations and service expenses. Construction payments and working-capital needs before first collections require phased-budget coordination.

Proposed startup budget / RMB4,000RMB 10,000

Project execution and reserve funds 70%

Intermediation and hospitality consultant budget 30%

Once credited against feedstock payments under the contract, mine-supply commitment payments are not counted again as costs. Startup budgets and full-cycle operating costs are accounted for separately.

Use-of-funds breakdown
Uses of fundsRMB 10,000Proportion
Ore-securing payment50012.5%
New production line1,50037.5%
Total operating funds50012.5%
Contingency reserve3007.5%
Financing intermediary commission80020.0%
Hospitality and consulting expenses40010.0%
Total4,000100.0%

04 / PARTICIPATION

Around this round's project,
Define participation and settlement mechanisms.

The following is a preliminary proposed standard arrangement. Investors directly confirm dedicated documents, collection accounts and fulfillment responsibilities with verified authorized contracting entities.

Standard participation unit100RMB 10,000 / share

40 units planned, totaling RMB 40 million.
The share structure does not indicate current subscription progress.

Shared investor dividend pool30%

40 shares share the project profit pool determined under the agreement.
Each unit represents 1/40 of the pool.

Cumulative limits and termination of rights2× · Including principal

After the cumulative amount agreed in the agreement is reached,
Terminate the corresponding project income rights.

Calculate actual returns before implementing distributions.

Operating collections → Agreement-based accounting → Distributable returns → Pro rata distribution → Cumulative records

Mechanism example: if an agreement confirms project profit of RMB 10 million for a period and all 40 rights units are valid, the calculated amount per unit is 10 million × 30% ÷ 40 = RMB 75,000. Actual payment depends on distributable returns, collections and the agreement.

View specific arrangements for cash, shares and gold pre-orders +

Cash settlement:Pay from actual distributable income and collections, counted cumulatively toward the agreed limit.

Share rights settlement:Security type, conversion price, lock-up period, registration and settlement conditions remain undefined; confirmed value counts toward the same cumulative limit.

Gold reservation:Purchase payment is separate; reference price, specifications, quantity and delivery conditions are agreed separately, and gold purchase funds and project investment funds are accounted for separately.

The relationship between project income shares and company equity requires dedicated documents. Cumulative 2× is a rights-termination condition; distribution amounts and timing depend on operations and collections.

TAILINGS VALUE / Integrated residual-tailings utilization

Beyond gold: three expected residual-tailings income sources

The following project-party expectations have been added for Project No. 3 in Anhua, Yiyang, Hunan. The measurement basis is standardized asRMB/residual-tailings tonne, listed separately from the core gold business estimates. Applicability to this project will be determined using this mine's policy, testing, process and sales documentation.

Government subsidies

30~200 RMB/residual-tailings tonne

Sponsor-expected income contribution, using the sponsor's gross-profit terminology. Applicable policies, compliant throughput, approvals and actual receipts require mine-specific verification and cannot be treated as approved subsidies.

Processing residual-tailings solid waste into floor tiles

500~1,000 RMB/residual-tailings tonne

Measured in residual-tailings tonnes lawfully usable for processing. Formulation, tailings blending ratio, finished yield, product testing, processing costs and real sales require validation; residual-tailings tonnes cannot be treated directly as finished tile tonnes.

Recovery of other precious metals

400~1,000 RMB/residual-tailings tonne

Sponsor expectations excluding the core gold business. Metal types, content, recoverability, processing and settlement costs require validation; reconcile with gold income and floor-tile feedstock destinations to avoid double-counting.

Source: On 2026.10.06, the sponsor provided the ranges above and confirmed residual-tailings tonnes as the measurement base. This shows expected gross profit contributions, not realized revenue, net profit or investor distributions. Government subsidies' financial classification and project gross-profit definitions require separate confirmation.

In the calculation, each expected contribution =Actual residual-tailings tonnes meeting this item's conditions × mine-verified unit return. Each revenue stream may have different eligible volumes and cost scopes. Do not assume all residual tailings qualify, directly add the ranges, or multiply them by the 1 million tonnes of feedstock. Residual-tailings volumes must be supported by actual processing, moisture and material-balance records.

The three items above are currently excluded from the existing gold scenario model and proposed dividend pool. Inclusion in contractual profit requires checking this project's rights scope, cost deductions, taxes, collections and dedicated agreements.

05 / PROJECT MATERIALS

From understanding the proposal,
Proceed to mine-specific material review.

The Anhua project's grade, recovery rate, costs and operating results require independent mine-specific validation. Review this project's contracts, tests, trial-production and funding materials.

Preliminary proposal available

Scope and top-level budget

The September 2026 dedicated discussion materials set out the resource scope, proposed financing, construction plan and participation mechanism.

Pending provision / Review

Contracts and entity documents

Mine-supply contracts, delivery deadlines, commitment-payment offsets, company authorization, collection responsibilities and project-rights relationships.

Pending acquisition / Disclosure

Testing and trial-production records

This mine's sample identifiers, locations and depths, wet/dry basis, process tests, recovery conditions and stable capacity.

Awaiting dedicated confirmation

Budget and settlement terms

Construction phases, working capital, profit definition, expense allocation, exit conditions, and share and gold-purchase arrangements.

View preliminary operating scenarios and modeling assumptions +

The preliminary proposal assumes processing 1 million wet tonnes, equivalent to 700,000 dry tonnes, gold output of 0.8 grams/wet tonne and costs of RMB 550/dry tonne. These parameters require mine-specific testing and trial-production validation. The table's balance still requires reconciliation with capital expenditure, full expense allocation and actual collections.

Preliminary proposal scenario estimates; all parameters are assumptions
ScenarioGold output
Grams/wet tonne
Costs
RMB/dry tonne
Gold price
RMB/g
Estimated balance
× RMB 100 million
Lower gold price0.85509003.35
Baseline assumptions0.85501,0004.15
Higher gold price0.85501,1004.95
Downside pressure0.4650900−0.95

All use a fixed dry-equivalent quantity of 700,000 dry tonnes; downside scenarios come from stress assumptions in the preliminary proposal. Balances, actual profits and investor-distributable amounts are confirmed separately. Gold prices are scenario parameters.

Material basis: September 2026 “No. 2 Gold Tailings Project Financing Intermediary Cooperation Proposal,” distilled for investors. Page compiled October 5, 2026; current number changed on October 13, 2026 to Mine No. 3, Anhua, Yiyang, Hunan. The original PPT retains its “No. 2” title and content. Revisions will follow proposal updates.

06 / NEXT STEP

First understand the project,
Then confirm participation conditions.

Review materials and discuss technical and financial questions; arrange visits to ore sources or proposed processing facilities subject to actual access conditions, and form an independent judgment.

info@cnucap.com

  1. 01

    Project discussions

    Explain interests and material needs.

  2. 02

    Material and site review

    Review contracts, testing, trial production and staged budgets.

  3. 03

    Dedicated conditions confirmation

    Confirm entities, accounts, rights and settlement arrangements.

  4. 04

    Ongoing disclosure after investment

    Track production, gold output, sales and collections as agreed.

FACTS / SOURCES / CONTEXT

Page highlights and supporting materials

What is the current status of the Anhua investment proposal?

Based on the September 2026 gold tailings project financing intermediary cooperation proposal (originally No. 2, now No. 3 Anhua), this page introduces Anhua's proposed scope, independent production line and RMB 40 million funding arrangement. Its budget, rights and operating scenarios are proposal figures; specific matters still require formal-document review. The investment research and investment overview concern the same No. 3 Anhua project in Anhua, Yiyang, Hunan; the specific mine site and implementation conditions still require mine-specific materials.

Summary compiled: · Original data timestamps are as stated in the listed materials · Permalink to this section

Investment & financing overview Anhua gold tailings investment proposal