| Research scope for this round | Materials state 1 million wet tonnes contracted Contract copy requires verification | Phase one: 1 million wet tonnes Full repository approximately 3 million; subsequent approximately 2 million require separate investment and accounting | Proposed securing of 1 million wet tonnes Formal contracts and ownership require verification |
| Dry-tonne basis | Guaranteed minimum delivery of 700,000 dry tonnes Supplemental mine-supply obligations are subject to the contract | Minimum first-phase delivery: 700,000 dry tonnes Minimum delivery is not final actual throughput | Minimum delivery 700,000 dry tonnes Actual throughput requires batch records |
| Implementation pathway | Danzhai ore supply → Chenzhou refining Existing-line validation and new-line expansion | Drying and transfer near Xingren → Chenzhou processing Site, logistics, receiving and parallel arrangements for two mines remain to be established | Anhua ore source → Proposed processing in Chenzhou Overall startup with a separate new production line |
| Nature of capacity | Existing line trial production reference approximately 300 dry tonnes/day Stable-production target 500; new design capacity 1,500 Nominal total 2,000, not realized throughput | Supporting new line designed for 1,500 dry tonnes/day Proposed at Chenzhou; implementation configuration remains to be established | New line design capacity: 1,500 dry tonnes/day Pending construction, acceptance and continuous operating validation |
| Proposed funding and uses in this round | RMB 15 million / Dedicated new production line Construction RMB 12 million, intermediary fee RMB 3 million; operating working capital arranged separately | RMB 40 million / First-phase development Includes first-phase ore-securing payments; excludes development of the subsequent approximately 2 million wet tonnes | RMB 40 million / Full launch Six budget categories; RMB 5 million in ore-securing payments included in the total |
| Gold output and cost evidence | Gold output of 0.8 grams/wet tonne is a project sponsor reference RMB 550/dry tonne is a calculation assumption Awaiting testing, continuous-operation and financial verification | First-phase gold output 0.8 grams/wet tonne; costs RMB 550/dry tonne All are preliminary assumptions requiring validation using materials from the Xingren mine itself | Gold output 0.8 grams/wet tonne; costs RMB 550/dry tonne All are preliminary assumptions requiring mine-specific testing and trial production validation |
| Next verification priorities | Continuous processing, stable gold output and expansion support Retain testing, production, sales and collection records | First-phase contract boundaries, logistics and processing support Confirm this round's rights, interests and costs separately from subsequent ore quantities | Ore supply contracts, process trial production, engineering and funding Establish overall launch conditions and cost allocation |