WISER ASSET
WISER ASSET/Investment research/Physical-asset investment research

REAL ASSET RESEARCH

Physical-asset investment researchFrom mine-supply conditions,
to operating evidence.

Research development scope, line conditions and funding continuity for gold ore supply.
Understand different implementation pathways across Danzhai, Xingren and Anhua,
Then progressively validate operating assumptions through testing, trial production and collection records.

RESOURCE → PROCESS → CASH FLOWRESEARCH / 01—03
01 Danzhai02 Xingren03 Anhua
Research scope Gold mine supply / Three projectsContent basis Project-party materials and existing project pagesMaterial definitions 2026.09—2026.09.30

01 / PROJECT RESEARCH

Three projects, three research priorities.

Research each project according to its contractual scope and implementation conditions.
The stages listed on the page are arrangements stated in the materials; actual progress is confirmed by project records.

01 / GUIZHOU · DANZHAIExisting line validation and expansion

Danzhai Gold Tailings Investment Research

Use trial production references from the existing line to research stable production conditions and new line expansion, checking continuous processing, gold output and sales collections.

Mine quantity stated in the materials
10010,000 wet tonnes
Proposed dedicated fundraising for additional production lines
1,500RMB 10,000
Research priorities

Difference between trial production references and stable production targets
New-line construction and expense coordination

Open No. 1 Danzhai project investment research
02 / GUIZHOU · XINGRENFirst-phase scope and logistics

Xingren Gold Tailings Investment Research

Distinguish the full repository size from this round's first-phase scope; research drying and transfer near Xingren, supporting processing in Chenzhou and separate first-phase accounting.

Proposed first-phase quantity secured in this round
10010,000 wet tonnes
Proposed first-phase fundraising
4,000RMB 10,000
Research priorities

Relationship between the approximately 3 million total repository and 1 million first phase
Logistics, supporting production lines and expense allocation

Open No. 2 Xingren project investment research
03 / HUNAN · YIYANG ANHUAFull launch and new construction

Anhua Gold Tailings Investment Research

Validate mine-specific processes, construction and operating readiness item by item around mine-supply commitments, a separate new line and the complete startup budget.

Ore quantity proposed to be secured in this round
10010,000 wet tonnes
Proposed fundraising for full launch
4,000RMB 10,000
Research priorities

Ore supply contracts and mine-specific testing
New production lines and funding before first collections

Open No. 3 Anhua project investment research

The three budgets have different purposes: Danzhai is specific financing for a new line, Anhua is an overall launch budget, and Xingren is a first-phase development budget. Each project's financing progress and WISER ASSET project interests require confirmation through formal documents.

TOPIC / CIRCULAR INVESTMENT

Thematic research: connecting resources, production lines and funds.

Around the implementation pathway for circular investment,
Research ore supply, regional capacity, reinvestment of returns and financing continuity.

GOLD TAILINGS / CIRCULAR INVESTMENT

Gold tailings circular investment research

Research cost deductions, profit distributions, reinvestment of returns, mine-supply expansion and coordination of Hunan and Guizhou lines around tailings processing and sales collections, clarifying funding and agreement conditions.

Research priorities

  • Ore supply basis and phased construction
  • Mine-supply commitment investment and working capital
  • Asset ownership and financing arrangements
Gold tailings circular investment research

02 / PROJECT COMPARISON

Align scope before comparing conditions.

Use common dimensions while retaining project differences.
Trial-production references, stable-production targets and design capacity are presented according to their distinct nature.

On mobile, swipe horizontally to view the full comparison table →

Scope, production lines, budgets and validation conditions for Danzhai, Xingren and Anhua projects
Research dimensions01 Danzhai ↗02 Xingren ↗03 Anhua ↗
Research scope for this roundMaterials state 1 million wet tonnes contracted
Contract copy requires verification
Phase one: 1 million wet tonnes
Full repository approximately 3 million; subsequent approximately 2 million require separate investment and accounting
Proposed securing of 1 million wet tonnes
Formal contracts and ownership require verification
Dry-tonne basisGuaranteed minimum delivery of 700,000 dry tonnes
Supplemental mine-supply obligations are subject to the contract
Minimum first-phase delivery: 700,000 dry tonnes
Minimum delivery is not final actual throughput
Minimum delivery 700,000 dry tonnes
Actual throughput requires batch records
Implementation pathwayDanzhai ore supply → Chenzhou refining
Existing-line validation and new-line expansion
Drying and transfer near Xingren → Chenzhou processing
Site, logistics, receiving and parallel arrangements for two mines remain to be established
Anhua ore source → Proposed processing in Chenzhou
Overall startup with a separate new production line
Nature of capacityExisting line trial production reference approximately 300 dry tonnes/day
Stable-production target 500; new design capacity 1,500
Nominal total 2,000, not realized throughput
Supporting new line designed for 1,500 dry tonnes/day
Proposed at Chenzhou; implementation configuration remains to be established
New line design capacity: 1,500 dry tonnes/day
Pending construction, acceptance and continuous operating validation
Proposed funding and uses in this roundRMB 15 million / Dedicated new production line
Construction RMB 12 million, intermediary fee RMB 3 million; operating working capital arranged separately
RMB 40 million / First-phase development
Includes first-phase ore-securing payments; excludes development of the subsequent approximately 2 million wet tonnes
RMB 40 million / Full launch
Six budget categories; RMB 5 million in ore-securing payments included in the total
Gold output and cost evidenceGold output of 0.8 grams/wet tonne is a project sponsor reference
RMB 550/dry tonne is a calculation assumption
Awaiting testing, continuous-operation and financial verification
First-phase gold output 0.8 grams/wet tonne; costs RMB 550/dry tonne
All are preliminary assumptions requiring validation using materials from the Xingren mine itself
Gold output 0.8 grams/wet tonne; costs RMB 550/dry tonne
All are preliminary assumptions requiring mine-specific testing and trial production validation
Next verification prioritiesContinuous processing, stable gold output and expansion support
Retain testing, production, sales and collection records
First-phase contract boundaries, logistics and processing support
Confirm this round's rights, interests and costs separately from subsequent ore quantities
Ore supply contracts, process trial production, engineering and funding
Establish overall launch conditions and cost allocation

Basis: three project investment research pages and their original PPTs. Updated on October 13, 2026 following project confirmation to No. 2 Xingren, Guizhou and No. 3 Anhua, Yiyang, Hunan. The original PPTs respectively retain their original “No. 3” and “No. 2” titles and content, unchanged; parameters and materials remain associated with their respective mines. This is a compilation of materials, not a unified independent due-diligence conclusion; budget amounts and design capacities are not used to rank projects.

03 / EVIDENCE & NEXT CONDITIONS

Understand source status and continue validating assessments.

Switch projects to review current materials and next verification items.
Material status describes existing content only and does not equal actual engineering progress.

Danzhai / Existing-line validation and expansion

Sponsor trial-production references and expansion arrangements are listed; attached tests and site materials require individual review, while continuous operation and actual collections still require supporting records.

04 / GOLD, PROJECT & DISCLOSURE

Connect gold price research with this mine's conditions.

Prices, project conditions and actual execution jointly affect operations.
Move from research to capital arrangements, then review post-investment disclosures.

01 / MARKET

Gold price research

Review gold market conditions, drivers and observation criteria. Gold price parameters on project pages are settlement scenarios; research quotes must be aligned with actual sales settlements.

View gold AI investment research
02 / CAPITAL

Investment and financing arrangements

Understand uses of funds, participating entities and cooperation conditions. Ore quantities, financing amounts and design capacity use different bases; specific rights must correspond to formal contracts.

Explore investment & financing
03 / OPERATING RECORD

Public post-investment disclosure

Continue reconciling actual production, gold output, sales collections and cost records, and review public reports and material announcements.

Open post-investment section

Current project research is based on sponsor materials and scenario assumptions. Testing, contracts, actual capacity and funds allocation require item-by-item verification; estimated balances must reconcile capital expenditure, expenses and cash collections and do not directly equal profits distributable to investors.

FACTS / SOURCES / CONTEXT

Page highlights and supporting materials

How should these research materials be read?

First check the asset or project, observation time, sources and measurement basis, then interpret analysis and scenarios. Bitcoin and gold historical assessments are archived by UTC trading day; gold tailings research relies on sponsor materials, retaining labels for proposed parameters and verification items.

Research mine-supply scope, production-line conditions, use of funds, operating scenarios and verification items using Danzhai, Xingren and Anhua gold tailings materials, linking original project materials and archives. A separate gold tailings circular investment topic examines mine supply, regional capacity, reinvestment of returns and funding coordination.

Summary compiled: · Original data timestamps are as stated in the listed materials · Permalink to this section

Research content is retained chronologically, with data status and source bases explained separately.
Browse Bitcoin and gold daily archives and Danzhai, Xingren and Anhua project materials.

Open research report library