WISER ASSET

PROJECT 02 / GUIZHOU · XINGREN

Xingren gold tailings
Investment proposal

From tailings resources to gold assets.
Around first-phase resources, transfer processing and funding arrangements,
Define this round's investment scope and implementation pathway.

First-phase 1 million wet tonnes · Subsequent approximately 2 million wet tonnes require separate investment

RESOURCE → PROCESS → GOLD03 / ASSET
TAILINGS RESOURCEGOLD ASSETResources proposed to be securedRefining · Testing · Sales
Project pathway illustration / Not proof of physical assets or capacity
10010,000 wet tonnes

Proposed phase-one resource commitment

4,000RMB 10,000

Proposed phase-one financing · RMB

1,500dry tonnes / day

Independent new-line design capacity

Approximately 3months

Construction plan after funding is in place

01 / INVESTMENT SCOPE

Whole-stockpile resource background,
Explained separately from the phase-one investment.

The sponsor reports total stockpile size of approximately 3 million wet tonnes. This round proposes securing the first 1 million wet tonnes for collection, transport, transfer, processing and gold sales. First-phase contracts and rights are confirmed separately; subsequent approximately 2 million wet tonnes require separate ore commitments, investment and accounting.

Review the research basis for the Xingren project ↗
GUIZHOU / Guizhou

Guizhou · Xingren

Xingren, Guizhou → Drying and transfer near Xingren → Processing in Chenzhou, Hunan

Illustrative cities and processing directions; specific mines, sites and transport routes are subject to implementation documents.
Phase one of this round1 million wet tonnes
Separate subsequent investmentApproximately 2 million wet tonnes

Approximately 3 million wet tonnes in total stockpile is a sponsor-provided background figure; the graphic shows quantity relationships only.

Phase-one resource scope
Proposed first-phase securing of 1 million wet tonnes
Ore supplier entity materials
Guizhou Huiyuan Trading Co., Ltd.
Shown according to the existing prospectus; Xingren-specific contracts and authorizations await review.
Ore-securing payment budget
RMB 5 million, included in the RMB 40 million total
Delivery and deadlines
First-phase delivery, measurement, quality and deadlines
To be defined in Xingren's dedicated mine-supply contract.

The proposal lists minimum first-phase delivery of 700,000 dry tonnes; contracts, quality and metering conditions require implementation. Confirm minimum delivery targets, final receipts and scenario throughput separately.

02 / EXECUTION PATH

From Xingren to Chenzhou,
Connect the full first-phase implementation process.

The proposal envisages drying and transfer near Xingren, shipment to Chenzhou, Hunan for processing, and a supporting new production line. The receiving plant, logistics contracts, processing approvals and mine-specific line configuration are to be finalized in implementation documents.

01 / MINE SOURCE

Material collection at the mine

First-phase ore-source contracts and delivery
Measured in wet tonnes and recorded batch by batch

02 / TRANSIT

Drying and transfer

Drying and transfer near Xingren
Outbound dry tonnes and batch coordination

03 / CHENZHOU

Processing and gold output

Plant intake and processing at Chenzhou
Gold output weighing and metal plate testing

04 / CASH FLOW

Sales and accounting

Sales settlement and bank collections
Cost allocation and return accounting

Approximately 3-month construction plan

Advance construction and supporting works once funding and startup conditions are in place. The Chenzhou line budget is RMB 15 million, with design capacity of 1,500 dry tonnes/day; project construction scheduling and supporting configuration remain to be finalized, with actual capacity validated through trial production.

Key mine-specific verification priorities

Mine-specific sampling and wet/dry basis → Transfer and transport coordination → Process and stable capacity → First-phase sales and collections

03 / CAPITAL ALLOCATION

RMB 40 million,
For first-phase startup in this round.

This round's funds cover first-phase ore securing, production line construction, operations and service budgets. Full development investment for the subsequent approximately 2 million wet tonnes will be arranged separately. Construction payments and working capital needs before the first collection are coordinated through staged budgets.

Proposed startup budget / RMB4,000RMB 10,000

Project execution and reserve funds 70%

Intermediation and hospitality consultant budget 30%

Once credited against feedstock payments under the contract, mine-supply commitment payments are not counted again as costs. Startup budgets and full-cycle operating costs are accounted for separately.

Use-of-funds breakdown
Uses of fundsRMB 10,000Proportion
Ore-securing payment50012.5%
New production line1,50037.5%
Total operating funds50012.5%
Contingency reserve3007.5%
Financing intermediary commission80020.0%
Hospitality and consulting expenses40010.0%
Total4,000100.0%

04 / PARTICIPATION

Based on the phase-one contracted mine quantity,
Clarify the scope of participation rights.

The following is the proposed participation mechanism for Xingren; specific shares, rights and settlement conditions require confirmation through this project's special agreement. Investors review contracting entities, receiving accounts, authorization and performance responsibilities.

Proposed continuation of participation units100RMB 10,000 / share

40 units planned, totaling RMB 40 million.
The share structure does not indicate current subscription progress.

Proposed phase-one dividend pool30%

The phase-one profit pool established under 40 sharing agreements.
Each unit represents 1/40 of the pool.

Proposed mechanism for termination of interests2× · Including principal

After Xingren-specific confirmation and reaching the agreed amount,
Terminate the corresponding project income rights.

Calculate actual returns before implementing distributions.

Operating collections → Agreement-based accounting → Distributable returns → Pro rata distribution → Cumulative records

Mechanism example: if an agreement confirms project profit of RMB 10 million for a period and all 40 rights units are valid, the calculated amount per unit is 10 million × 30% ÷ 40 = RMB 75,000. Actual payment depends on distributable returns, collections and the agreement.

View specific arrangements for cash, shares and gold pre-orders +

Cash settlement:Pay from actual distributable income and collections, counted cumulatively toward the agreed limit.

Share rights settlement:Security type, conversion price, lock-up period, registration and settlement conditions remain undefined; confirmed value counts toward the same cumulative limit.

Gold reservation:If continued use is confirmed, separate payment for the goods is required. Reference prices, specifications, quantities and delivery conditions are agreed separately; gold purchase payments and project investments are accounted for separately.

Rights cover only first-phase contracted ore volumes; the subsequent approximately 2 million wet tonnes require separate investment. The relationship between project income shares and company equity, and termination upon a cumulative 2× payout, require Xingren-specific confirmation; distributions depend on actual operations and collections.

TAILINGS VALUE / Integrated residual-tailings utilization

Beyond gold: three expected residual-tailings income sources

The following project sponsor expectations are added to the first-phase scope of the No. 2 Xingren, Guizhou project. The common measurement basis isRMB/residual-tailings tonne, listed separately from the core gold business estimates. Applicability to this project will be determined using this mine's policy, testing, process and sales documentation.

Government subsidies

30~200 RMB/residual-tailings tonne

Sponsor-expected income contribution, using the sponsor's gross-profit terminology. Applicable policies, compliant throughput, approvals and actual receipts require mine-specific verification and cannot be treated as approved subsidies.

Processing residual-tailings solid waste into floor tiles

500~1,000 RMB/residual-tailings tonne

Measured in residual-tailings tonnes lawfully usable for processing. Formulation, tailings blending ratio, finished yield, product testing, processing costs and real sales require validation; residual-tailings tonnes cannot be treated directly as finished tile tonnes.

Recovery of other precious metals

400~1,000 RMB/residual-tailings tonne

Sponsor expectations excluding the core gold business. Metal types, content, recoverability, processing and settlement costs require validation; reconcile with gold income and floor-tile feedstock destinations to avoid double-counting.

Source: On 2026.10.06, the sponsor provided the ranges above and confirmed residual-tailings tonnes as the measurement base. This shows expected gross profit contributions, not realized revenue, net profit or investor distributions. Government subsidies' financial classification and project gross-profit definitions require separate confirmation.

In the calculation, each expected contribution =Actual residual-tailings tonnes meeting this item's conditions × mine-verified unit return. Each revenue stream may have different eligible volumes and cost scopes. Do not assume all residual tailings qualify, directly add the ranges, or multiply them by the 1 million tonnes of feedstock. Residual-tailings volumes must be supported by actual processing, moisture and material-balance records.

The three items above are currently excluded from the existing gold scenario model and proposed dividend pool. Inclusion in contractual profit requires checking this project's rights scope, cost deductions, taxes, collections and dedicated agreements.

05 / PROJECT MATERIALS

From understanding the proposal,
Proceed to mine-specific material review.

Xingren project grade, recovery rate, costs and operating results require independent mine-specific validation. Review this project's contracts, testing, trial production and funding materials.

Preliminary proposal available

Scope and top-level budget

The special communication materials dated September 30, 2026 set out the first-phase scope, proposed financing, transfer and processing arrangements, and proposed participation mechanism; this page's ore source location has been corrected to Xingren, Guizhou as confirmed.

Pending provision / Review

Contracts and entity documents

First-phase tailings storage area, delivery and measurement conditions, ore-securing payment offsets, company authorization, fund-receiving responsibilities and rights relationships.

Pending acquisition / Disclosure

Testing and trial-production records

This mine's sample identifiers, locations and depths, wet/dry basis, process tests, recovery conditions and stable capacity.

Awaiting dedicated confirmation

Budget and settlement terms

Cross-regional logistics, engineering and mine-specific line configuration, working capital, profit definitions and settlement terms proposed to be retained.

View preliminary operating scenarios and modeling assumptions +

The phase-one scenario assumes processing 1 million wet tonnes and 700,000 dry tonnes, gold output of 0.8 g/wet tonne and cost of RMB 550/dry tonne. These parameters require mine-specific testing and trial-production validation at Xingren; 700,000 dry tonnes is this table's processing-volume assumption. The balance must be reconciled with capital expenditure, expense allocation and actual collections.

Preliminary proposal scenario estimates; all parameters are assumptions
ScenarioGold output
Grams/wet tonne
Costs
RMB/dry tonne
Gold price
RMB/g
Estimated balance
× RMB 100 million
Lower gold price0.85509003.35
Baseline assumptions0.85501,0004.15
Higher gold price0.85501,1004.95
Downside pressure0.4650900−0.95

All use a fixed dry-equivalent quantity of 700,000 dry tonnes; downside scenarios come from stress assumptions in the preliminary proposal. Balances, actual profits and investor-distributable amounts are confirmed separately. Gold prices are scenario parameters.

Evidence: No. 3 Gold Tailings Project Financing Intermediary Cooperation Proposal dated September 30, 2026, distilled for investors. Page compiled October 5, 2026; on October 13, 2026 the project was corrected to No. 2 Xingren mine, Guizhou. The original PPT retains the original No. 3 title and content. Revisions will follow proposal updates.

06 / NEXT STEP

First understand the project,
Then confirm participation conditions.

Review materials, discuss technical and financial questions, and arrange visits to ore sources, transfer facilities or proposed processing facilities subject to actual access conditions, forming an independent assessment.

info@cnucap.com

  1. 01

    Project discussions

    Explain interests and material needs.

  2. 02

    Material and site review

    Review contracts, testing, trial production and staged budgets.

  3. 03

    Dedicated conditions confirmation

    Confirm entities, accounts, rights and settlement arrangements.

  4. 04

    Ongoing disclosure after investment

    Track production, gold output, sales and collections as agreed.

FACTS / SOURCES / CONTEXT

Page highlights and supporting materials

How does Xingren's first phase differ from total stockpile resources?

Project materials list a total stockpile of approximately 3 million wet tonnes, with 1 million wet tonnes in this first phase and proposed financing of RMB 40 million. Subsequent approximately 2 million wet tonnes require separate investment and accounting; first-phase budgets and operating scenarios cannot simply be scaled to the entire stockpile.

On October 13, 2026, following sponsor confirmation, the webpage name and number were corrected to No. 2 Xingren, Guizhou; original attachments, material dates and modeling parameters were retained.

Summary compiled: · Original data timestamps are as stated in the listed materials · Permalink to this section

Investment & financing overview Xingren gold tailings investment proposal